Engineered above-ground Class 10c private bushfire shelters designed for rapid tilt-tray delivery across regional properties. Relocatable, non-combustible construction with zero sub-surface excavation required.
Southern Highlands & South Coast (Bowral, Batemans Bay, Bega): ~3.5–4.5 hours transit.
Blue Mountains & Hawkesbury (Katoomba, Bilpin, Springwood): ~4.5–5 hours transit.
NCC Class 10c Private Bushfire Shelter • Patent Pending
Engineered & CSIRO-Tested Above-Ground Bushfire Shelters for High-Risk Properties.
The Transportable Fire Shelter Unit (TFSUFZ) is a factory-built Class 10c Private Bushfire Shelter engineered in regional Australia. Full-scale physical fire testing at the CSIRO Mogo facility to 1,024°C provides verified tenability evidence for municipal building surveyor assessment when evacuation is compromised.
Australian Fire Shelters undergo full-scale physical destructive fire testing at Australia's accredited research facilities. Citing CSIRO Mogo Appraisal FE2828 (nominal 29 kW/m² radiant heat wash and direct flame immersion up to 1,024°C) and Bomen falling timber drop testing (500kg log impact resistance).
Flame Exposure Testing (FE2828Rpt3): Engulfed in direct flame front exceeding 1,000°C+ simulating Flame Zone bushfire front passage. Internal cabin temperatures remained below 30°C.
29 kW/m² Radiant Heat Test (FE2828Rpt2): Verified multi-layer passive thermal decoupling and smoke seal integrity under prolonged convective and radiant wash.
Falling Timber Impact Test (Bomen Report): Drop impact testing with a 500kg log dropped from height demonstrating roof shell resistance without structural penetration.
Engineering Peer Reviews: Independent fire safety engineering peer review and chartered structural engineering calculations supplied for building certifier approval.
Engineered as transportable above-ground private bushfire refuges for residential acreage, farmsteads, local government facilities, and commercial rural sites.
Model TFSUFZ — Flame Zone Refuge
Configured for 3 occupants in extreme BAL-FZ conditions. Engineered with heavy-gauge structural steel chassis, non-combustible Aerated Concrete thermal envelope, and high-integrity intumescent perimeter seals.
Model TFSU29 — BAL-29 Refuge
Configured for up to 4 occupants in bushfire attack levels up to BAL-29 with dual permanent passive vents sealed with fireproof plugs during bushfire events.
Statutory Approval Pathway: NCC Class 10c Private Bushfire Shelter
Private bushfire shelters are classified under the National Construction Code (NCC) / Building Code of Australia (BCA) as Class 10c structures. Approval is achieved through a Performance Solution assessed by an appointed municipal building surveyor or accredited private certifier. Australian Fire Shelters provides the complete technical engineering pack, structural computations, and CSIRO test appraisal FE2828 to support your certifier's assessment.
What is a private bushfire shelter and how does an above-ground refuge work?
An above-ground private bushfire shelter is an engineered life-safety refuge of last resort operating under NCC Class 10c performance requirements. Its heavy structural steel chassis and multi-barrier thermal envelope attenuate extreme radiant heat and exclude smoke while fire fronts pass.
What is the difference between Class 10c and a shipping container or timber shed?
Shipping containers and corrugated steel sheds are single-skin structures without non-conductive thermal breaks. Under intense radiant heat, thin steel conducts heat rapidly, elevating internal temperatures above 300°C and releasing toxic off-gassing from paints and floor treatments. A dedicated Class 10c refuge is engineered specifically to withstand intense thermal radiation and maintain tenable conditions.
What are the standard site setback and foundation requirements?
Installation requires a minimum 6-metre clear defensible setback from the primary dwelling or unmanaged combustible hazards. The unit is sited on a 150mm reinforced concrete slab or compacted 200mm crushed-rock pad (100 kPa minimum bearing capacity).
How is the shelter delivered and installed?
Each shelter is 100% prefabricated in regional NSW and transported directly to your property on a heavy tilt-tray or crane truck. Placement onto the prepared foundation pad takes approximately 45 minutes.